F.P. Miller Company
Inventory
Repair & Rebuild
Want to Sell?
Blog
About Us
Contact Us
Home
|
Customer Login
|
Sitemap
A Trinity Holding, Inc. Company
Metal Shaping
Automatic Chuckers
Automatic Screw Machines
Blanchard Grinders
Boring Mills
Broaches
CNC Machines
Drilling Machines
Fabricating Machines
Grinding Machines
Lathes
Milling Machines
Presses
Metal Cutting
Saws
Miscellaneous
Air Compressors
Conveyors
Misc. Machine
Pumps
Tooling, Attachments, & Accessories
Home »
Inventory »
Grinding Machines »
Blanchard #32D-60, 60" Vertical Spindle Rotary Surface Grinder
Blanchard #32D-60, 60" Vertical Spindle Rotary Surface Grinder
Tag Number:
16093
Machine Type:
Grinding Machines
UMCC:
G8100
Manufacturer:
Blanchard
Model:
32D-60
Year:
1964
Serial Number:
11358
Description:
Blanchard #32D-60, 60" Vertical Spindle Rotary Surface Grinder
We Offer
Turnkey Services
with this Machine.
Printer Friendly Page
Machine has been Sold or is not Currently Available
Overall Specifications
Machine is finished
60" Diameter Magnetic Chuck (7/8" Chuck Life)
66" Swing
32" Segmented Wheel
18" Height Over Chuck
New 10 HP Variable speed AC table drive system
Power down feeds from .004" to .080" Min.
Power Raising & Lowering of grinding head
Equipped With:
New dresser arm assembly
New Auto Lubrication systems to Head and Table
New Rectifier & Chuck Control
Pendent Control
Spindle Drive Motor, 100HP, 3/60/440 Volt and Electrical Controls
Thank you for choosing F. P. Miller Company to provide you with a quote on our rebuild Blanchard Rotary Surface Grinder. The work performed consists of a complete rebuild including specific items as follows:
1) MACHINE DISASSEMBLY:
a) Completely disassemble machine & inspect parts and castings.
b) Clean and wire brush all parts
2) TABLE AND TABLE SUPPORT WAYS:
a) Machine as required.
b) Precision Scrape, fit the table support ways to the table ways.
c) Installation of Moglice wear material in cup.
d) Grind magnetic chuck hardened bull gear
3) CARRIAGE AND BASE WAYS:
a) Re-grind hardened base ways
b) Precision scrape and fit carriage to base ways.
c) Installation of new Amco Bronze wear strip
4) VERTICAL SLIDE AND COLUMN WAYS:
a) Machine column ways
b) Machine spindle housing & install new cast iron wear strips
c) Precision scrape and fit the vertical slide ways to the column ways including gibs.
d) Install new Elevating Screw and Nut
5) CARRIAGE AND TABLE DRIVE MECHANISMS
a) Rebuild carriage drive assembly (replace all gears, shafts, bearings and seals).
b) Install new Rack and Pinion
c) Replace table drive gearbox with 10Hp variable speed AC motor, gear reducer & associated electrical controls
6) HEAD FEED MECHANISM:
a) Inspect and rebuild head feed as required (including replacing all bearings and seals).
b) Install new Feed worm gear and pinion, remove backlash.
7) SPINDLE UNIT COMPLETE:(Completely Rewound)
a) Disassemble the spindle unit, clean and evaluate.
b) Replace the upper and lower spindle bearings
c) Rewind spindle complete
d) Reassemble the spindle unit, and test.
8) ELECTRICAL FEED MOTORS:
a) Disassemble feed motors, clean and evaluate.
b) Replace bearings
9) LUBRICATION SYSTEM:
a) Install new automatic oil lubrication system
b) Remove all lube lines on the carriage, base and table.
c) Replace all lube blocks and clean oil ports on the carriage, base and table.
d) Re-pipe with all new lines and fittings, the carriage, base and table.
10) GREASE SYSTEM:
a) Install new automatic grease system
b) Replace all lube lines on the column ways.
c) Replace or re-use all lube blocks and clean oil ports on the column ways.
d) Replace all lube fittings on the column.
11) ELECTRICAL:
a) Provide all new wiring on machine
b) Install new variable magnetic chuck controller
c) Install new limit switches and push button switches
d) Electrical panel components cleaned, wires replaced as necessary.
e) Install new soft start for table
f) Provide updated Electrical Schematics
g) Provide new manuals
12) MAGNETIC CHUCK:
a) Meg Magnetic Chuck
b) After machine is reassembled grind chuck flat
13) GUARDING AND COOLANT LINES:
a) Fabricate and install all new water guards including
updated one piece sliding front guard
b) Fit to machine
c) Install new coolant Lines and External Clean Out Hose
14) PAINT:
a) Sand entire machine to original machine surface.
b) Clean.
c) Prime and paint machine tool grey.
15) REASSEMBLY OF MACHINE COMPLETE AND TEST:
REQUIREMENTS:
1. CONTRACTORS RESPONSIBILITY:
F. P. Miller will be responsible for furnishing all services, labor, parts and materials necessary to rebuild the machine as described above.
2. DISASSEMBLY AND INSPECTION:
-All areas and items of rebuild will be completely dismantled to basic parts and castings.
-All parts and castings will be thoroughly inspected for defects.
3. REUTILIZATION OF PARTS:
-All parts that will be reused will be in such condition to assure proper part function and fit. This applies to parts which are used as is as, as well as those that are repaired, or replaced.
4. REPLACEMENT PARTS:
-Replacement parts will be OEM or a suitable substitute.
5. BEARINGS:
-All bearings associated with spindle, regardless of condition, will be replaced with new bearings of the same type and precision class or better.
6. SEALS AND GASKETS:
-All seals and gaskets will be replaced with new seals and gaskets of a type equal to or better than original quality.
7. FASTENING DEVICES:
-All fastening devices will be inspected and all defective devices will be replaced.
8. ACCEPTANCE TEST:
-The machine will be run off at F. P. Miller Company with testing witnessed by customer.
9. DOCUMENTATION:
-Two complete sets of machine documentation covering
-Electrical diagrams, maintenance and operating procedures, will be provided to customer
10. TRANSPORTATION:
-It is the customers responsibility for transportation from F. P. Miller Company, we can assist with arrangements upon request.
-F. P. Miller will need Advanced Notice of Shipping Arrangements, prior to picking up machine, for proper time to package and prep machine
11. DELIVERY:
-Immediate delivery, machine is completed
WARRANTY:
F. P. Miller Company warrants the rebuild of this machine against defective materials and workmanship. The warranty terminates (6) months or 2000 operating hours, whichever occurs first, from delivery (some regional restrictions do apply). This applies only if the machine has been installed correctly and used in normal and proper manner under recommended operating conditions.
AVAILABLE OPTIONS:
Set up and run off in customers facility
Coolant System
TERMS: 30% with purchase order; 60% after acceptance run-off at F. P. Miller Company viewed by customer; 10% Net 30 Days after delivery of the machine to the customer upon approved credit.